Storm Shelter Installation Process: What to Expect in Oklahoma
Wondering what actually happens when your storm shelter is installed?
The process is pretty simple. We bring the shelter and equipment, complete the installation, and most customers have a ready-to-use storm shelter within a few hours.
Before Installation Day
Before your appointment, we’ll make sure the planned location works for the shelter and our equipment.
We need to know about fences, gates, trees, overhead lines, septic systems, wells, propane, sprinkler systems, private electric lines, and anything else that could affect access or installation. Our post on storm shelter installation access explains how much room the truck and crane need.
We call OKIE811 to mark public utility lines. Private lines, such as water, propane and sprinkler lines, aren’t marked by OKIE811. Let us know about any private lines on your property before installation.
Do You Need to Be Home on Installation Day?
No, as long as the spot where you want the shelter is clearly marked out and you’re available to answer questions. Some customers prefer to be there at the start to confirm the spot.
Payment is due in full at installation. If you won’t be home, payment needs to be left on-site for us.
Above Ground Storm Shelter Installation
Most of our above ground storm shelter installations take approximately two hours.
- We prepare and level the native ground.
- The truck and crane are positioned near the installation site.
- The precast concrete shelter is lifted from the truck and set in place.
- The shelter is anchored into the ground.
- The shelter and door are checked before cleanup.
The shelters sit on the ground and anchor into it, so they don’t need a separate concrete pad.

Below Ground Storm Shelter Installation
Most of our below ground storm shelter installations take approximately 3–4 hours.
- The shelter area is excavated.
- The crane lowers the precast concrete shelter into the excavation.
- Soil is backfilled around the shelter.
- The remaining dirt is left built up around the shelter to allow for settling.
The 6×8 Slope Front and 6×8 Easy Access leave about one dump truck load of extra dirt; the 7×10 Jumbo leaves about two to three. The amount varies with site conditions. As the soil settles, you can gradually rake out the extra dirt while maintaining drainage away from the shelter entrance. If you don’t want the extra dirt left on your property, dirt haul-off can be arranged when you book your installation, for an additional charge. We can’t haul dirt when the ground is wet.

For more on living with one after installation, see What to Expect with a Below Ground Storm Shelter in Oklahoma.
What About Rain or Wet Ground?
We install year-round as long as the ground isn’t too wet for our trucks. Storm shelter installation requires very heavy equipment. If the ground is too wet to safely access your property, installation may need to be rescheduled.
This is especially important after periods of heavy Oklahoma rain, when the ground stays saturated even after the weather clears. Above ground installs are usually less affected because no shelter excavation is required, but wet ground can still delay them. Severe storms and extreme cold can also delay installation.
Rain-free days don’t always mean the ground is ready: one soaking rain can leave it too soft for our equipment for a week or longer, depending on the soil and conditions at your property. When weather postpones installations, later appointments can move back too, so it’s smart to allow time for a possible reschedule, especially in spring and fall. Our post on the best time to install a storm shelter in Oklahoma explains how weather affects scheduling.
After Your Storm Shelter Is Installed
Your shelter is ready to use as soon as installation is complete.
Check with your city or town, or your county emergency management office, about registering your storm shelter. Keep your warranty information somewhere easy to find, and stock your shelter with emergency supplies.
Grease the door hinges at least once a year, as required by the manufacturer’s warranty (we recommend every six months), using the grease zerks on the hinges. Condensation can form inside a shelter, and airing it out on a dry day can help. If you notice water inside and aren’t sure of the cause, contact us.
Who Actually Installs Your Shelter?
We’re owner-operated, and we install our storm shelters without subcontracting the installation work.
We started Sprague’s Backhoe in 2013.
Frequently Asked Questions
How long does storm shelter installation take?
Most of our above ground installations take approximately two hours, and most of our below ground installations take approximately 3–4 hours. Access, weather and ground conditions can affect timing.
Do I need a concrete pad for an above ground storm shelter?
No. The shelters sit on the ground and anchor into it, so they don’t need a separate concrete pad.
Do I need to be home for my storm shelter installation?
No, as long as the spot is clearly marked out and you’re available to answer questions. If you won’t be home, payment, which is due in full at installation, needs to be left on-site.
Can I use my storm shelter right after installation?
Yes. Your shelter is ready to use when installation is complete.
What happens if the ground is too wet for storm shelter installation?
If saturated ground makes it unsafe to operate our equipment, we’ll reschedule. The ground can stay too soft after the rain stops, and earlier weather delays can also push back later appointments.
Does Sprague’s Backhoe install both above ground and below ground storm shelters?
Yes. Above ground installation is available throughout Oklahoma. We install below ground storm shelters from our Blanchard location. A delivery charge applies beyond a 60-mile radius. Below ground installation may not be available in all areas, so contact us to confirm availability and any delivery charge for your address.
Key Takeaways
- Most of our above ground installations take approximately two hours.
- Most of our below ground installations take approximately 3–4 hours.
- Private utilities and property obstacles need to be identified beforehand.
- You don’t need to be home if the spot is clearly marked out and you’re available to answer questions. Payment is due in full at installation.
- Above ground shelters don’t need a separate concrete pad.
- Wet ground can delay installation.
- Your shelter is ready to use as soon as installation is finished.
Keep reading
More From the Blog
-
Buying guide
What You Need to Know About Storm Shelter Installation Access
August 8, 2025
Read Article: What You Need to Know About Storm Shelter Installation Access
-
Storm shelters
Best Time to Install a Storm Shelter in Oklahoma
September 19, 2025
Read Article: Best Time to Install a Storm Shelter in Oklahoma
-
Storm shelters
What to Expect with a Below Ground Storm Shelter in Oklahoma
August 29, 2025
Read Article: What to Expect with a Below Ground Storm Shelter in Oklahoma
Ready to Get Started?
Fill out our storm shelter request form, or give us a call, and we’ll help you plan your installation.