What You Need to Know About Storm Shelter Installation Access

One of the most common questions we receive is:

“Will your equipment fit in my yard?”

Access planning is a normal part of the installation process, especially in neighborhoods throughout Oklahoma City, Norman, Moore, Yukon, Mustang and surrounding communities.

Here’s what to expect so installation day goes smoothly.

How Much Space Does the Crane Truck Need?

Our crane truck delivers the shelter and sets it in a location that meets the installation and equipment-access requirements. A loaded truck can weigh approximately 80,000 pounds, so it needs firm ground and enough space to set up.

Minimum Access Requirements for Our Equipment

These dimensions describe what our equipment needs. Requirements vary by installer and equipment.

  • About 10 feet of width for straight-line access to the installation area. That’s the bare minimum, measured from eaves, AC units and other obstacles, not from the walls of your house.
  • About 14 feet of vertical clearance along the entire path, including under trees, carports and eaves.
  • About 25–30 feet of height clearance where the crane offloads the shelter.
  • About 4–5 feet on each side of the truck for the outriggers that stabilize the truck while it lifts.
A crane truck with its outriggers out on both sides, lifting a 7x9 above ground storm shelter off the back in Ninnekah, Oklahoma
A 7×9 above ground storm shelter being lifted off the back of the truck in Ninnekah, with the outriggers out on both sides.

Plan for the shelter to be set off the back of the truck. In most cases, we lift the shelter off the back, not the side. Sometimes a side set is possible, but that’s decided case by case, so plan your access for a back-only set.

Can You Set a Shelter Over a Fence?

In many cases, yes.

If we can position the crane truck directly against your fence line and the shelter spot is right on the other side, we can often lift and set the shelter over standard 6–8 foot residential fencing. That only works when the spot is close to the fence, not more than about 10 feet in.

A 6x8 above ground storm shelter lifted by crane over a backyard fence in Moore, Oklahoma
A 6×8 above ground storm shelter going over a backyard fence in Moore.

Easements: a spot that close to a fence line can fall in a utility easement, especially inside city limits and in smaller yards. Check with your city or town before you settle on that spot.

We may still need yard access for leveling. If your gate opening is less than about 10 feet wide, you’ll typically need to remove one or two fence panels. Give us a call and we’ll pull your property up on the map to talk through access before installation day.

Tree Clearance and Overhead Obstacles

Mature trees are common across Oklahoma. Tree branches may need trimming to provide clearance for the truck and crane. Both above ground and below ground storm shelter installations need clear overhead space.

Why Clearance Matters

  • Hydraulic protection: tree limbs can snag or damage the hydraulic lines that power the crane.
  • Shelter protection: branches can scratch your new shelter.
  • Fewer delays: a clear path keeps installation day on schedule.

Please trim branches to give about 14 feet of clearance along the path and about 25–30 feet over the spot where the crane lifts the shelter. Finish trimming and any fence work at least a week before your installation.

Not sure your yard will work?Fill out our request form, and we’ll pull your property up on the map to talk through access.

Request a Storm Shelter

Before Installation Day

Most yards only need a little preparation. Here’s what helps:

  • Fence panels: removing and reinstalling fence panels is the homeowner’s responsibility. We don’t provide that service.
  • Buried lines: we call OKIE811 to mark public utility lines. Private lines, such as water, propane and sprinkler lines, aren’t marked by OKIE811. Let us know about any private lines on your property before installation.
  • Septic and sprinklers: let us know if the truck’s path crosses a septic tank, lateral lines or a sprinkler system.
  • A neighbor’s yard: if the only way in is across a neighbor’s property, get their permission before installation day.

You can read more about installation day itself in our storm shelter installation process post.

Success in Tight Spaces

We’ve installed storm shelters in almost every kind of Oklahoma residential setting, from rural properties to small city lots. That includes narrow backyards, yards with overhead power lines and spots that took some planning to reach.

If your first choice won’t work, there’s often another spot on the property with better access. If a below ground shelter won’t fit, an above ground shelter may be an option.

Watch Our Crane in Action

Keep the Shelter Easy to Reach After Installation

Our storm shelter warranty requires clear access to the shelter. Fences, decks, walls or landscaping that obstruct access for inspection, maintenance or repair can void the warranty. Read the full terms on our storm shelter warranty page.

Key Takeaways

  1. Plan ahead: about 10 feet wide and 14 feet high along the path, plus about 25–30 feet of height clearance where the crane lifts and about 4–5 feet on each side of the truck for the outriggers.
  2. Back-set: plan for the shelter to be set off the back of the truck.
  3. Over-fence is possible: when the spot is right over the fence, not more than about 10 feet in.
  4. Gates: openings under about 10 feet usually mean removing a fence panel or two.
  5. Prep a week early: finish tree trimming and fence work at least a week before installation.

Frequently Asked Questions

Does storm shelter installation include fence panel removal?

No. We don’t provide fence panel removal. It’s the homeowner’s responsibility to remove and reinstall fence panels as needed for equipment access.

Can a storm shelter be installed near overhead power lines?

It depends on the location and the arrangements with the power company. In our experience, most power companies will temporarily disconnect lines when needed for installation. The homeowner contacts the power company to arrange this. Discuss overhead lines with us before scheduling the work.

What if my yard doesn’t meet the storm shelter access requirements?

Sometimes another spot on your property has better access. If your property doesn’t have enough space for our equipment, we may not be able to complete the installation. Give us a call and we’ll pull your property up on the map to talk through your options.

How far ahead should I trim trees or remove fence panels before storm shelter installation?

Finish your preparations at least one week before installation. That allows time for adjustments and helps installation day go smoothly.

Can weather delay storm shelter installation?

Yes. We install year-round as long as the ground isn’t too wet for our trucks. Ground can stay too soft for a week or longer after a soaking rain, even once the weather clears, and earlier weather delays can push back later appointments. Above ground installs are usually less affected by wet ground, but they still can be. Extreme cold can also delay an installation. Read more about the best time to install a storm shelter in Oklahoma.

Written by

Stacey Sprague

Owner & Office Manager


Stacey answers your questions, organizes the details and schedules the work. She manages utility locates through OKIE811 and the paperwork homeowners need for permits, tribal storm shelter assistance programs, rebates and financing. She also writes our blog to help Oklahoma homeowners understand their options and prepare for installation.

More About Us

Stacey Sprague

Keep reading

More From the Blog


Wondering if We Can Reach Your Spot?

Call or send a request, and we’ll pull your property up on the map to talk through access.